又色又爽又高潮免费视频观看,99精品视频在线观看,玩弄JAPAN白嫩少妇HD小说,日韩无码专区,国产中文欧美日韩在线,97精品超碰一区二区三区,亚洲精品久久久中文字幕痴女,成人无码A片在线观看,69国产精品人妻无码免费,娇妻裸体交换俱乐部61

Electrical Control System of Double-inlet and Double-outlet Coal Mill

Electrical control system of double-inlet and double-outlet coal mill includes low voltage cabinet for control auxiliary equipment, electrical ear measurement device for controlling and monitoring material position and differential pressure measurement device. Low voltage PLC cabinet is the core of control system control and monitors, the mill operation through receiving the entire signal and transmitting the signal to center control DCS system by bus interface. With the ladder diagram program required by equipment production technology, according to the input command signal, PLC shall judge and logical process and send relevant command to make sure all the parts of mill operate efficiently. 

 

NHI double-inlet and double-outlet coal mill electrical control system with advanced automatic control equipment can achieve the following function; mill can operate safely and continuously around 300 days with no faults. During the running of mill, wearing parts can be filled in with mill non-stop, and mill can response fast according to load variation. Mill can realize double-inlet and double-outlet, single-inlet and double-outlet and semi-grinding according to the requirement of boiler load. More than 400 NHI production coal mill electrical systems are in safe operation in the coal-fire power field in Southeast Asia and North America.

主站蜘蛛池模板: 临西县| 两当县| 甘德县| 钟祥市| 侯马市| 观塘区| 怀远县| 安宁市| 海城市| 镇沅| 康马县| 涡阳县| 综艺| 大竹县| 古田县| 呼伦贝尔市| 漳平市| 二连浩特市| 天祝| 镇原县| 巨野县| 九江县| 酒泉市| 保亭| 临江市| 湘潭县| 乌兰浩特市| 宁明县| 兴业县| 宽甸| 花垣县| 宜城市| 宝应县| 清涧县| 江安县| 丽江市| 惠东县| 丽水市| 麻栗坡县| 洪湖市| 五台县|